Renewable Energy Technologies
India's renewable energy capacity reached ~190 GW (2024), targeting 500 GW by 2030. Solar (~85 GW), wind (~45 GW), hydro (~47 GW), bioenergy (~10 GW). Key technologies: solar PV, wind turbines, hybrid, storage (batteries, pumped hydro), green hydrogen. Policies: NSPM (National Solar Mission), NWM (Wind Mission), PLI (solar manufacturing), GBI, ISTS waiver. Challenges: land, grid integration, storage, finance, domestic manufacturing.[TOPIC CLASSIFICATION]
- Topic type: Science & Technology - Renewable Energy
- PYQ frequency: High
- Exam stage: Prelims + Mains
- Primary GS paper: GS 3
[EXAMINER REASONING]
- Trap: Confusing installed capacity with generation. Capacity (GW) is potential; generation (GWh) depends on capacity factor (solar ~20%, wind ~25-30%). Many aspirants quote capacity as actual output.
- Most confused: The policy landscape: NSPM (2010, 100 GW solar), NWM (wind), PM-KUSUM (solar pumps), PLI (solar PV manufacturing, Rs 24,000 cr), ISTS waiver (inter-state transmission). Many aspirants mix up missions and schemes.
- Key anchor: The 500 GW by 2030 target (COP26): 280 GW solar, 140 GW wind, 10 GW biomass, 5 GW small hydro, 65 GW hydro. Current ~190 GW (solar 85, wind 45, hydro 47, bio 10). Green Hydrogen Mission (Rs 19,744 cr) for 5 MMT by 2030.
- Current affairs hook: RE capacity ~190 GW (2024). Solar ~85 GW, wind ~45 GW. PLI Scheme 2.0 (Rs 24,000 cr) for solar PV manufacturing. Green Hydrogen Mission (2023, Rs 19,744 cr). PM-KUSUM (solar pumps, 3.5M by 2026). Battery storage PLI (Rs 18,100 cr). COP28: triple renewables by 2030.
- Mains hinge: Assess: Can India meet 500 GW by 2030? The land acquisition, grid integration (storage, forecasting), domestic manufacturing (PLI), and finance (green bonds, foreign investment) bottlenecks are the Mains frame.
Core Concept
India's renewable energy journey: 4th largest globally (~190 GW, 2024). Targets: 175 GW by 2022 (missed), 500 GW by 2030 (COP26). Breakdown 2024: Solar ~85 GW (ground-mounted, rooftop, PM-KUSUM), Wind ~45 GW (onshore, offshore potential 70 GW), Large Hydro ~47 GW, Small Hydro ~5 GW, Bioenergy ~10 GW.
Solar: National Solar Mission (2010, revised 100 GW), PLI Scheme (Rs 24,000 cr for solar PV modules, cells, wafers), PM-KUSUM (3.5M solar pumps by 2026), rooftop solar (Phase II, 4 GW residential). Floating solar (Ramagundam 100 MW).
Wind: Onshore ~45 GW (Tamil Nadu, Gujarat, Maharashtra, Karnataka), Offshore potential 70 GW (Gujarat, Tamil Nadu). Wind-Solar hybrid policy (2018). Repowering old turbines.
Hydro: Large hydro ~47 GW (classified as renewable 2019), pumped storage (PSPs) for grid balancing (8 GW operational, 100+ GW potential). Small hydro ~5 GW.
Green Hydrogen: National Green Hydrogen Mission (2023, Rs 19,744 cr), target 5 MMT by 2030, electrolyzer manufacturing PLI. Battery storage: PLI (Rs 18,100 cr), 4 GWh target.